Old Thayer Library
Braintree, MA
Exterior stabilization of the 1874 building included the removal and replacement of the 140-year old slate roof, restoration of the copper finials, copper ridge and caps of the hip roof, installation of new copper gutters and downspouts and cleaning and repointing of the exterior brick and stone masonry.